Paste your weekly review results and see whether the error rate of an AI tool has changed, with limits, run signals, and the pooled recent weeks against your tolerance.
Tool
Enter the weekly review results
Limit = p̄ ± 3√(p̄(1−p̄)/n)
Enter one line per week: the number of items reviewed and the number found wrong, separated by a comma, for example 120,7. If you review the same number each week, you can enter just the error count and set the sample size below. The first weeks set the center line and the limits. Load the example to see a classifier that drifts after a vendor change.
Everything runs in your browser. Nothing is sent to a server, and entries are not saved between visits. The example is made-up data. Intervals are 95% Wilson intervals.
Results
Has the error rate changed?
Weeks entered
--
Center line (baseline)
--
Upper limit, latest week
--
Latest week
--
First week above the limit
--
First week of a run signal
--
Recent weeks pooled
--
95% interval, pooled
--
Against the tolerance
--
Enter the weekly results to see the chart and the signals.
Picture
P-chart of the weekly error rate
Week by week
Week
Reviewed
Errors
Error rate
Upper limit
Signal
What This AI Drift Monitor Does
The monitor turns the results of your weekly sample of AI output into a p-chart. It sets the center line and the control limits from your first weeks, then tests every week for a point above the upper limit, a point below the lower limit, and a run of consecutive weeks on one side of the center line. It also pools the most recent weeks, gives a 95% Wilson interval, and compares it with your tolerable error rate.
Total errors in the baseline weeks divided by total items reviewed in them
Control limits
Center line plus or minus three standard errors, using each week’s own sample size; the lower limit is not allowed below zero
Above the limit
A weekly error rate above that week’s upper limit
Run signal
The chosen number of consecutive weeks above (or below) the center line, eight by default
Pooled recent weeks
Errors and items over the last few weeks, with a Wilson 95% interval compared with the tolerance
Worked Example
The pre-loaded data are 120 items a week for 20 weeks. The first 10 weeks give a center line of 5.75% and an upper limit of 12.13%. A vendor model change in week 11 is followed by a slow rise. A run of eight above the center line is complete in week 18; the first point above the limit is in week 20. The last four weeks have 51 errors in 480 items (10.6%), with a 95% interval of 8.2% to 13.7%, which reaches above the 10% tolerance. The data are made up.
Limits and Good Practice
Use the baseline weeks only if the tool was stable then. If it was not, the limits will be wrong.
Sample at random and the same way each week. A convenient sample can hide the problem.
A signal says something changed. It does not say why. Look at the model version, the inputs, and the reviewers.
Small weekly samples give wide limits. A small, real drift may need more items, or more weeks pooled.
Seeded test items belong in a separate count. Leave them out of the error rate (see the Human Review Sampling Log).
The tolerance is a business decision made in your plan. This page does not set it for you.
AI Drift Monitor Frequently Asked Questions
What does the AI Drift Monitor do?
It draws a p-chart of the weekly error rate in a sample of reviewed AI output, flags weeks above the limit and runs on one side of the center line, and compares the pooled recent weeks with your tolerable error rate using a Wilson 95% interval.
Why use a run of eight weeks?
Eight consecutive points on one side of the center line is a common run rule in statistical process control, because it is unlikely when nothing has changed. It often signals a slow shift earlier than a point above the limit. You can change the run length.
How many baseline weeks do I need?
At least ten if you can, while the tool was stable and the sample was random. Fewer weeks give less reliable limits.
What is the difference between the control limits and the tolerance?
Control limits show what variation to expect from sampling alone, given the baseline. The tolerance is what the business can accept. A tool can be stable and above the tolerance, or drifting and still within it.
Does this tell me why the error rate changed?
No. It tells you that it changed and roughly when. Check the model or tool version, the input mix, and the reviewers, as the guide describes.