Enter backlog, arrivals, and capacity
Core formulas: Finished per day = passes × (1 − rework); Days to clear = backlog / (finished − arrivals); Wait = backlog / finished
Calculator Library / Public Service
Find out how long a service backlog will really take to clear and how long a new case waits, and see how much cutting rework or adding capacity would change it.
Tool
Core formulas: Finished per day = passes × (1 − rework); Days to clear = backlog / (finished − arrivals); Wait = backlog / finished
Burn-down
Scenarios
| Scenario | Rework | Passes / day | Finished / day | Net / day | Days to clear | Wait for a new case (days) |
|---|
Instructions
This analyzer answers a question most service offices cannot: how long will it really take to clear our backlog, and how long does a new case wait? It combines the number of waiting cases, the arrival rate, and the team's capacity, and it adjusts capacity for rework, because a pass that sends a case back does not finish it.
Use it to compare options such as reducing rework, adding capacity, or both, and to explain to leaders why fixing the front end of a process can beat hiring.
| Measure | Formula | Meaning |
|---|---|---|
| Cases finished per day | Passes per day × (1 − rework rate) | Only passes that do not return actually finish a case. |
| Net change per day | Finished per day − arrivals per day | Positive means the backlog shrinks. |
| Days to clear | Backlog / net change | Working days until the backlog reaches zero, if arrivals and capacity stay constant. |
| Wait for a new case | Backlog / finished per day | Little's Law: work in process divided by throughput. |
The pre-loaded values show 1,200 waiting claims, 55 arriving per day, 80 passes per day, and 25% rework. Finished cases are 80 × 0.75 = 60 a day, so the net is 5 a day and the backlog takes 1,200 / 5 = 240 days to clear. A new claim waits about 1,200 / 60 = 20 days.
With rework cut to 12.5%, finished cases become 70 a day, the net is 15, and the backlog clears in 80 days. A 10% capacity increase without touching rework clears it in 1,200 / (66 − 55) = about 109 days, so halving rework beats adding 10% capacity in this example.
The tool subtracts the arrival rate from the number of cases finished per day, after removing passes that return for rework, and divides the backlog by that net figure. If arrivals equal or exceed finished cases, the backlog never clears at the current rate.
Rework is any pass that sends a case back instead of finishing it, such as a request for missing information, a correction, or a re-review. Define it consistently and measure it as a share of case passes, not as a share of cases.
It depends on the numbers, and the scenarios table shows both. When rework is high, reducing it often frees more capacity than a modest increase in staff, and it improves the resident's experience as well. Adding staff to a process with high rework can simply add more rework.
The wait is the average time a case spends in the system while the backlog exists, from Little's Law. The days to clear is how long it takes to eliminate the backlog. A backlog can be stable and still cause long waits, because the wait depends on how large it is compared with the rate of finished cases.