Live Tool

Chart setup

Cycle Time: SUM(manual + walk + machine time per element)

Manual time Walk time Machine / auto time

Enter times in seconds. Word and Google Docs exports download an HTML document. Excel exports an `.xls` worksheet, and Google Sheets exports a CSV file.

Editable List

Work elements

Work ElementManual (s)Walk (s)Machine/Auto (s)

Preview

Standard Work Combination Chart

How to Use This Standard Work Combination Chart Builder

Enter the current takt time, then list each work element in the cycle with its manual, walk, and machine or automatic time in seconds. The chart stacks each element's time types into a bar so the team can see where time is spent, and the summary compares total cycle time against takt time.

Using the Results

Situation Suggested Response
Cycle time is well under takt time Look for opportunities to combine tasks or reduce headcount
Cycle time is close to takt time Standardize carefully; little slack remains for variation
Cycle time exceeds takt time Rebalance elements across operators, automate a step, or add capacity

Export and Print Options

Use Print / Save PDF to open the browser print dialog and save the finished chart as a PDF. Use the Word and Excel buttons when you need an editable file for Microsoft Office. Use the Google Doc and Google Sheet buttons when you need a file that can be uploaded or imported into Google Drive.

FAQ

What is a Standard Work Combination Chart?

A Standard Work Combination Chart shows how manual, walk, and machine or automatic time combine for each work element in a cycle, making it easy to see where an operator's time is spent relative to takt time.

How is this different from a time study?

A time study captures raw observed times. A Standard Work Combination Chart organizes those times by element and time type into a visual timeline used to balance work and design standard work.

What does it mean if total cycle time exceeds takt time?

If cycle time exceeds takt time, the process cannot keep pace with customer demand at current staffing and methods. Work elements need to be rebalanced, automated, or moved to another operator or station.

Can I export the combination chart?

Yes. This tool supports print or save-as-PDF, Word-compatible HTML, Excel-compatible spreadsheet output, Google Docs-compatible HTML, and Google Sheets-compatible CSV.