Live Tool

Changeover setup

Stage 1: Separate · Stage 2: Convert · Stage 3: Streamline

Editable Steps

Changeover steps

Step Current Min. Classification Convert to External? Streamlined Min.

Results

Projected Changeover Time

StageChangeover TimeTime per Shift

How to Use This Calculator

List every step in a real, timed changeover. Classify each as Internal (requires the machine stopped) or External (could be done before or after the stop). Check "Convert to External" on any internal step you plan to move off the machine entirely — pre-staging, pre-heating, or pre-assembling on a jig. For remaining internal steps, enter a streamlined time reflecting functional clamps, positioning stops, or parallel operations.

Reading the Results

StageWhat It Represents
BaselineTotal time of every listed step, as if none had been separated yet.
After SeparationTotal time of only the steps classified Internal — external steps are moved off the downtime clock.
After ConversionAfter removing any internal steps checked "Convert to External."
After StreamliningUsing each remaining internal step's streamlined time estimate.

FAQ

How does this SMED calculator estimate time savings?

It totals baseline downtime from your listed steps, then shows reduced downtime after separating external steps out, converting selected internal steps to external, and streamlining whatever remains.

What should I enter as the streamlined time for a step?

Your best estimate of the step's time after Stage 3 techniques like functional clamps or positioning stops. Leave it equal to the current time if no specific improvement is planned yet.