Lockout/Tagout Procedure and Audit Sheet
An Excel workbook for an energy control program: an inventory that shows which machines have procedures, devices, and a current inspection, a machine-specific procedure form, and a record of periodic inspections with corrective actions.
The Inventory tab lists each machine with its energy sources, isolation points, whether a written procedure exists, whether the devices are adequate, the date of the last periodic inspection, and whether the authorized employees are trained. The next inspection due date and a status calculate: Compliant, No procedure, Devices missing, or Inspection overdue.
The Procedure tab is a form for one machine: every energy source with its isolating device, where it is, how stored energy is released, and how isolation is verified, plus the standard sequence from preparation to restoring the machine. The Inspections tab records each periodic inspection with findings, corrective actions, due dates, and status. The Summary tab shows coverage and open findings, with a chart.
Example data for twelve machines at an illustrative plant are included so you can see the formulas working before you replace them.
Download Lockout/Tagout Procedure and Audit Sheet Back to Templates
What Is Included in the Workbook
| Sheet | Purpose | What Teams Capture |
|---|---|---|
| How-To | Guidance and disclaimer | Steps and notes |
| Summary | As-of date, coverage, and status | Machines with a procedure, devices, and a current inspection; fully compliant machines; machines by status with a chart; open and overdue findings |
| Inventory | The machine inventory (Excel Table) | Machine, energy sources, isolation points, procedure, devices, last inspection, next due, training, calculated status, action needed |
| Procedure | A machine-specific procedure form | Energy sources and isolating devices, stored-energy release, verification, standard sequence, special cases |
| Inspections | Periodic inspection record (Excel Table) | Date, machine, inspector, authorized employee observed, findings, corrective action, due date, status |
Key Features Inside the Template
Coverage at a Glance
See how many machines have a procedure, devices, and a current inspection, and how many are fully compliant.
Status That Calculates
Each machine shows Compliant, No procedure, Devices missing, or Inspection overdue against the as-of date you enter.
A Procedure Form for Each Machine
List every energy source, how it is isolated, how stored energy is released, and how isolation is verified.
Inspections With Follow-Up
Record findings and corrective actions with due dates, and see which are open or overdue.
Best Use Cases
- Building an inventory for a new energy control program
- Preparing for an annual periodic inspection of lockout procedures
- Finding the machines with the most urgent gaps after an audit finding
- Writing machine-specific procedures with maintenance and operators
- Showing management the coverage of the program
How to Use the Template Effectively
- List every machine or group of similar machines that has hazardous energy, with the energy sources and the number of isolation points.
- Record whether each has a written procedure and adequate devices at the machine, and when it was last inspected.
- Write a machine-specific procedure for each machine that needs one, with the people who use it, and add photos of the isolation points.
- Fit missing devices and train authorized employees, starting with the highest-risk machines.
- Carry out the periodic inspections, with an inspector who is not the person using the procedure, and record the findings and actions.
- Review the summary at the safety committee, and close the actions.
Who Should Use This Template
- Maintenance and engineering leads
- EHS managers and safety coordinators
- Supervisors and area managers
- Safety committee members and auditors
Common Mistakes to Avoid
- Treating a stop button or emergency stop as an energy-isolating device
- Writing one generic procedure for all machines
- Forgetting stored energy such as hydraulic pressure, air, springs, and raised loads
- Using tags without locks where a lock is practical
- Never carrying out or recording the annual inspection
Important Notes
Lockout/Tagout Procedure and Audit Sheet Frequently Asked Questions
How is the status of a machine decided?
In order: if there is no written procedure, the status is No procedure; if the devices are not adequate, Devices missing; if the last periodic inspection is missing or more than 365 days before the as-of date, Inspection overdue; otherwise Compliant.
How do I change the as-of date?
Enter a date in cell B3 of the Summary tab. Type =TODAY() there if you want the status to follow the current date every time the file opens.
Can I add more machines or inspections?
Yes. The Inventory has 40 rows and the Inspections tab 50. Drag the table's resize handle to add more, and copy the formulas in the calculated columns.